Installed 5793
A group of fitters installed the cable line in 9 changes, and the second group completed the same task in 1/3 less time.
How many shifts would the third group do the same work if, with all three groups working together, the assembly took 2 shifts?
How many shifts would the third group do the same work if, with all three groups working together, the assembly took 2 shifts?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Reconstructing 23991
Three groups take turns reconstructing one piece of highway. The first group would finish the job themselves in 40 working days. The second group is in 24 working days, and the third group is in 30 working days. How many days do you do it together?
- Three workshops
One workshop can complete the task in 48 days, the second in 30 days, and the third in 20 days. In how many days would the task be completed if all workshops worked?
- Adjusting 72554
Two working groups are adjusting the park. The first group will do the work in 15 days and the second in 25 days. How many days will they work together?
- Workers
Two workers would fulfill a certain task when working together for 10 days, the first if he worked himself done work in 17 days. How many days will the second worker do the whole job?
- Installation 4123
The team of installers is to carry out the installation in 20 days. By adding two fitters from the beginning of the work, the assembly was completed in 15 days. How many were on the team?
- Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work.
- Together 8086
The first tiler would cover the inside of the pool in 5 working days, and the second would need seven working days for the same work. In how many days would they line the inside of the pool together?