Performance 7737
Zdenek, weighing 54 kg, made 15 push-ups on the crossbar. The height he reached was about 40 cm. What kind of work did he do? What would have been his performance if the whole exercise had taken him a minute and a half?
Correct answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Chocolate
Children break chocolate first to third and then every part of another half. What kind got each child? Draw a picture. What part would have been received if each piece had halved?
- Performance 66404
A person weighing 50 kg can climb 15 stairs. One step is 18 cm high. Determine a person's performance when: a) slowly climbing the stairs if it took him 13 seconds b) going down the stairs slowly if it took him 10 seconds c) quickly climbing the stairs if
- Performance
Two masons with the same performance would have been made of plaster for six days. One of them, however, has increased its daily performance by 50%. How long would it take them now to make plaster together?
- Inclined plane
1. How much work W do we have to do to pull a body weighing 200 kg along an inclined plane with a length of 4 m to a total height of 1.5 m? 2. Find the force we need to exert to do this if we neglect frictional resistance. 3. Find the force we would need
- Roland 2
Roland sold his watch at a 15% loss. If he had sold it for 210 USD more, he would have made a profit of 20%. Find the cost of price of the watch.
- Ballistic curve
The soldier fired the ballistic grenade at a 45° angle. The first half ascended, and the second fell. How far and height did it reach if his average speed was 1200 km/h, and what 12 seconds were taken from the shot to impact?
- Repairman
The repairman has vowed to do repair work at the plant for 25 days. However, work had to be shortened, so he took a helper worker. Together, they made all the corrections for the whole day. How long would it take work to help workers?