Agricultural 65594
Six identical harvesters were supposed to work on the harvest for 12 days in the agricultural cooperative. After three days, however, two harvesters left for another team. Find how long the harvest time in the farm cooperative has increased.
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Farm
Agricultural cooperative (farm) produced 14144 liters of milk for 16 days, which exceeded the plan by 1984 liters. How many liters of milk had a day planned to produce? - Harvesters 5853
One combine harvester harvests a wheat field in 12 hours, and another combine harvester in 16 hours. How long does the same field harvest the third combine harvester alone if all three harvesters harvest the wheat field in 2 hours? - Harvesters
Five combine harvesters harvest wheat in 12 days. How much will the harvest time be shortened when six combine harvesters enter the field? - Efficient 43461
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 day
- One combine
One combine harvester can harvest a field of corn in 4.5 hours. Another harvester can harvest the same field in 3 hrs. If the farmer uses the two harvesters at the same time. How long will it take to harvest the entire field? - Materials 4405
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials - Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe