Wood harvesting
The harvested wood is bundled from the forest to a sawmill. The driver makes the journey four times a day, and the work takes him eight days. How often would he have to go daily to finish the job two days earlier?
Correct answer:
![](/img/67/woord_2.jpg)
Tips for related online calculators
Check out our ratio calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to round the number?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to round the number?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
- algebra
- equation
- expression of a variable from the formula
- arithmetic
- rounding
- basic functions
- ratio
- inverse proportion
- simple proportion
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Construction 2798
The truck driver drives bricks for construction. If he went three times a day, he would produce the bricks needed for construction in 12 days. How many times a day does he have to go to finish work three days earlier?
- Painting rooms
If Daniel paints for three hours daily, he completes it in 7.5 days. How many hours a day would he have to work to finish the job 1.5 days earlier?
- Wood
Peter chops wood. If they cut down a half hour a day, he would finish work in nine days. But Peter needs to finish work three days earlier. How many minutes should they cut down a day?
- Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he go every day to be done two days earlier?
- Sawmill factory
Peter works in the factory. The bus stop is 10 km from the factory. Therefore, when the bus arrives for Peter, the driver always leaves the factory and takes him to work. They arrived at the saw exactly at 8:00. Today, the bus arrived 11 minutes earlier,
- Painters 4
One painter will do the job for 12 days. After a 4 1/3 day, he comes second to help him complete work together for eight days. How long would work the second painter himself?
- Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f