Wall builders
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places.
Correct answer:
Tips for related online calculators
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Building a wall
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places. - Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall? - Calculate 72594
Karel, Peter, and Milan helped pick apples. It took Karl 30 minutes, Peter 45 minutes, and Milan 36 minutes to turn over one full box of apples. Calculate how long it would take them to acquire 3 full crates together. Mark one answer: a. 32 minutes b. 36 - Men at work
8 men can finish a piece of work in 40 days. If 2 more men joined with them, then how many days it will take to complete the work?
- Bivariate data set
Here is a bivariate data set in which you believe y to be the response variable. x y 51.4 44.8 60.2 46.6 60.1 46.8 45.8 46.3 37.4 41.8 72.4 52.5 60 48.2 67.5 49.5 60.9 49.8 51.1 45.7 62.7 49.6 194.9 84.2 Make a scatter plot of this data. Which point is an - Z-score
The mean adult male pulse rate is 67.3 beats per minute, with a standard deviation of 10.3. Find the z-score for an adult male's pulse rate of 75. (Round the z-score to two decimal places. ) - Propagation 81955
A plane flying at 612 km/h speed sent a sound signal. In front of the aircraft (in the direction of flight), there is a fixed object at a distance of 3 km, from which the sound is reflected back to the plane. How long will it take the pilot to hear the ec