20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk:
a) 4 workers
b) 5 workers
c) 10 workers
a) 4 workers
b) 5 workers
c) 10 workers
Correct answer:
![](/img/3/chodnik2.jpg)
Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk?
- Diggers
The excavation was carried out in 4 days, and five workers worked on it for 7 hours daily. Determine how long it would take to excavate if seven workers worked on it 8 hours a day.
- Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job?
- Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters.
- Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f
- In the Gargen
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile
- Workers
Ten workers must pave the road for 22 working days. After four days were spent speeding up work, two more workers were added. a) After how many work days do workers complete the paved road? b) How many working days does a total paved road take?