City plan
The city planned to repair the highway section for 20 hours. Workers reduced this time by 20%. How long did the repair take? (express in hours and minutes)
Result
Result
![](/img/73/cars_1.jpg)
Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you want to convert time units like minutes to seconds?
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Highway repair
The highway repair was planned for 15 days. However, it was reduced by 30%. How many days did the repair of the highway last?
- Temporary 67594
Two temporary workers comb apples from 15 apple trees in 5 hours and 20 minutes. After two hours, three other temporary workers came to help them. How long did it take to comb apples from these 15 trees?
- Minutes 47973
The workers halved the planned break, so it lasted 42 minutes. How many minutes would it take to extend it by only a quarter?
- Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate?
- Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work.
- Permitted 80726
The highway section is 25 km long, and the maximum permitted speed is 110 km/h. The driver covered this section in 12 minutes. Did he exceed the speed limit?
- The work
The work was to be done by 150 workers. At the beginning of their work, The company reduced their number by 40, which increased the work time by 5 and 1/3 of the schedule. How long did the work take?