Roofers 20413
Three roofers put the roofing on the roof in 8 days. How long will it take to get two more after three days?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Complete 19783
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover?
- Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate?
- Painters 81101
Four painters painted the house in 14 days. How long will it take if 2 more come to help after 5 days?
- Highway
Six trucks will be used to build the roadside for 18 days. After three days, the company sent two more trucks to make. How long will it take for the material to move?
- Construction of road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Roofers 82541
Three roofers cover a third of the roof in 10 days. In how many days would 5 roofers cover the entire roof at the same rate?
- 10 workers
Ten workers will perform the assigned work in 8 days. If six workers work for six days and then another six join them, how long will it take to get the job done?