Eight masons
Eight masons will plaster a wall with an area of 1440 m2 in 9 days. They work 8 hours a day. How much area will plaster six masons in 4 hours?
Correct answer:

Tips for related online calculators
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Work together
Two bricklayers are plastering a wall. The first would plaster it in 8 hours, the second in 12 hours. If they work together, how many hours will they be done?
- A contractor
A contractor wants to plaster Wall, which is 2650 m². He sends 50 masons to do the work equally. What size of the Wall does each Mason plaster?
- Bricklayers 18773
According to the standard, we calculated that two masons would plaster the corridor of the new school building in 54 hours. How long would it take for nine bricklayers to plaster this corridor?
- Performance
Two masons with the same performance would have been made of plaster for six days. One of them, however, has increased its daily performance by 50%. How long would it take them now to make plaster together?
- Deadline
Five equally skilled masons built half the wall in 14 days. They must build the remaining part in 6 days to catch the planned deadline. How many more masons need to be allocated for construction?
- Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned
- Bricklayer 38291
A bricklayer will lay 12 m³ of brickwork in 4 days if he works 7 hours a day. How many days will he lay 51 m³ of masonry if he works 8.5 hours daily?