Time + reason - practice problems - page 4 of 19
Number of problems found: 379
- Carpenters 44401
Eight carpenters will make 30 chairs in 2 days. In how many days will ten carpenters make 72 chairs?
- Pedestrian 40151
The pedestrian will drive 5 km in 1 hour The car will travel 90 km in 1 hour How many times is a pedestrian slower than a car?
- Measuring 39453
Before the holiday, Mom bought 2 towels measuring 90cm x 120cm, 4 towels measuring 70cm x 100cm, and 3 small towels measuring 40cm x 60cm. They were all made of the same material. She washed them at home and left them to dry on the balcony. How long did i
- Transported 39423
A maximum of 15 people can fit into one cabin on Lomnický štít. The cable car runs every 20 minutes, and the journey takes 15 minutes. In the shortest time, can 52 ninth graders there on a trip be transported to Lomnický štít?
- The family
How old is a mother if she is four times older than her daughter, and five years ago, she was even seven times older than her daughter? Today, a son is 30 years younger than a father. Seven years ago, a father was seven times older than a son. How old is
- Two ports
Two ships commute along the same route between the ports of Mumraj and Zmatek. They spend negligible time in ports, turn around immediately, and continue sailing. At the same time, a blue ship departs from the port of Mumraj, and a green ship departs from
- Granddaughter
In 2014, the sum of the ages of Meghan's aunt, her daughter, and her granddaughter was equal to 100 years. We know the age of each can be expressed as the power of two. In what year was the granddaughter born?
- Double-track line
A 160 m long passenger train runs on a double-track line in one direction at a constant speed of 54 km/h, and a 240 m long express train in the opposite direction. a) How fast is the express train if passing the passenger train driver for 6 s? b) How long
- Deceleration of car
The car has a speed of 60 km/h and, after a 100 m journey speed of 40 km/h. What is the deceleration of a car if we assume that its movement is constantly slowed down?
- Borrowing bicycle
Jakub lent a bicycle to friends who wanted to ride it. For a three-hour bike ride, Jakub received two chocolates. Yup. If you wanted a bike for 2 hours, you had to give Jakub 12 candies. Peter gave Jakub 1 chocolate and three candies. How long can Peter r
- There 3
There are six bays at an oil change shop. It takes 45 minutes to work on a car at each bay. Cars are coming every 6 minutes to the shop for an oil change. How long before cars start backing up? What kind of spacing is needed to maintain proper flow?
- Everyday
One employee leaves with two briefcases every day and returns on the 4th day. These two briefcases won't be available till the 05th day as the departing employee leaves before the briefcases arrive back and are adequately cleaned. How many briefcases are
- Environmentally 30731
Peter plans to buy a used seven-seater for a large family. The so-called van or MPV. The first car Renault Espace 2.0 dCi 16V Dynamique 2006, costs 2000 euros + 350 euros registration for Slovak brands, imported from Italy. It is 14 years old and has a co
- Used cars
Peter plans to buy a used car: The first car was a Renault Espace 2.0 dCi 16V Dynamique 2006, which cost 2000 euros. It is 14 years old and has a combined diesel consumption of 8 liters. / 100 km. Diesel costs 1.1 euros/liter. How much will the car cost h
- Father and son
When I was eight years old, my father was 30 years old. Today, my father is three times more than me. How old am I?
- Poplar shadow
The nine-meter poplar casts a shadow 16.2 m long. How long does a shadow cast by Peter at the same time if it is 1.4 m high?
- Candles
Before Christmas, Eva bought two cylindrical candles—red and green. Red was 1 cm longer than green. She lit a red candle on Christmas Day at 5:30 PM and a green candle at 7:00 PM, leaving them on fire until they burned. At 9:30 PM, both candles were the s
- Eggs
One egg boiled for 10 minutes. How long will it take to boil ten eggs at a time?
- Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do seven workers earn in 10 days with the same daily average salary?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.