Maths practice for 12-year-olds - page 277 of 355
Number of problems found: 7083
- Book discount
Jurko bought the book for € 9.60. He found out that he bought it with a 36% discount. How many euros did Jurko save? - Road repair time
Ten workers managed to repair the road in 22 days. After four days, two more workers joined to speed up the work. How many days does it take to repair the road? - Class students
3/4 of the class went skiing. Of those who stayed home, 1/3 fell ill, and the remaining 6 were at a math camp. How many students does the class have? - Cube diagonals
Determine the length of the body and wall diagonals of the cube, the volume of which is equal to 0.343 decimetres. Also, calculate its surface. - Potatoes
Daniela and Michael would jointly dig potatoes for 7.5 hours. But if Daniela was working alone, she would take 2.5 hours more than if he were working with Michael. Determine how much for the work done by Michael himself and how much Daniela herself. - Sheep arrangement
Shepherd has less than 500 sheep. If he organizes them in 4 rows, he will remain three sheep. If he manages them in 5 rows, he will remain four sheep. If he arranges them in 6 rows, he will remain five sheep. But it can manage them exactly in 7 rows. How - Letter puzzle
Find out what numbers need to be substituted for the letters X, Y, and Z to have the following relation: XZY + XYZ --------- YZX - How many
How many cans of blue paint need to be bought if the interior of the garden pool, which is 5 m long, 3 m wide, and 1 m deep, is to be painted? There is 1 kg of paint in each can. One can is enough for 8 m² of area. - Equation solving
Solve a simple equation with a minus before the parenthesis: 4x- (x-4) = 5-3x - Seconds to days
1000000 seconds. How many days is it? - Summands
Find two summands of the number 42 so that its product is minimized. - Installation team
The team of installers is to carry out the installation in 20 days. By adding two fitters from the beginning of the work, the assembly was completed in 15 days. How many were on the team? - Number puzzle
Which number increased by its seventh will give 32? - Metric fractions
Express the fraction and decimal number of which part of the meter is: 120mm, 25cm, 7dm, 670mm, 48cm, 9.7dm. - Cruise liner
The cruise liner runs along the river between points A and B. The journey downstream takes 40 minutes and 1 hour upriver. The flow rate of the river is 3 km/h. What is the speed of a cruise liner? - Pumps
Five pumps pumped 1,800 hl of water for 3 hours. How many hectoliters of water did the same two powerful pumps pump for six hours? - Photo arrangement
Four girlfriends want to take a photo together. How many different ways can they stand side by side? - Expression value
Specify the value of this expression: (2-7) · 1012 - Cuboid surface
Determine the surface area of the cuboid if its volume is 52.8 cm cubic and the length of the two edges are 2 cm and 6 cm. - Cuboid - Vab
Find the surface of the cuboid when its volume is 52.8 cubic centimeters and the length of its two edges is 2 centimeters and 6 centimeters.
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.
