Sidewalks 83417
The pavers paved 1/8 of the total area of the sidewalk on the first day.
On the second day, they paved 20 square meters of pavement. In both two days, they paved 50 square meters of sidewalks. Calculate the total area of the sidewalk.
On the second day, they paved 20 square meters of pavement. In both two days, they paved 50 square meters of sidewalks. Calculate the total area of the sidewalk.
Correct answer:

Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
You need to know the following knowledge to solve this word math problem:
algebraplanimetricsnumbersUnits of physical quantitiesGrade of the word problem
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Paving 2
It will take a construction company 8 working days to pave the sidewalks on two streets in a city if all 6 pavers work. However, only 4 pavers can complete the job because the other two have been dismissed. How many working days will it take the group of
- Competitors 2970
During the five-day car race, the route measured 879 km on the first and 650 km on the second. The competitors covered a total of 4,655 km. How many km did they cover in the next three days?
- Amount 64464
There are 12,000 tons of coal on the first dome and 2,200 tons on the second. They take 80 tons from the first kick every day and 60 tons from the second. How many days will the same amount of coal be on both kicks?
- Cleared 16683
The scouts decided to clean up the stream outside the town. On the first day, they cleared half of the total length of the stream. On the second day, 2/7 of the entire length. On the third day, they cleared a third of what was left, and on the fourth day,
- Grapes harvesting
The foreman harvested grapes for three days, a total of 2,510 kg. On the second day, they peeled 480 kilograms less than the first day, the third day, and 25% more than the first day. How many kilograms of grapes did the part-timers pick the second day?
- Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters.
- In the Gargen
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile