Construction 82214
At the construction site, the sand that belongs to the mortar is sifted through a sieve. At the same time, 1/6 of the coarse sand falls through. Determine how many m3 of sand must be brought in to obtain 2 m3 of sifted sand.
Correct answer:

Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Tip: Our volume units converter will help you convert volume units.
Tip: Our volume units converter will help you convert volume units.
You need to know the following knowledge to solve this word math problem:
- algebra
- expression of a variable from the formula
- basic functions
- inverse proportion
- direct proportionality
- simple proportion
- numbers
- fractions
Units of physical quantities:
Grade of the word problem:
Related math problems and questions:
- Belongs 8412
Given a circle k(O; 2.5 cm), a line p: /Op/=4 cm, a point T: T belongs to p and at the same time /OT/=4.5 cm. We must find all the circles that will touch the circle k and the line p at point T.
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks?
- A sand
A sand timer has 5 5/16 ounces of sand. If the sand falls at a rate of 2.5 ounces per minute, how many minutes will the timer last? Write your answer as a fraction.
- Everyone drinks the same
Twenty-four bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same.
- Construction of road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he go every day to be done two days earlier?
- Construction 80124
The father offered to work on the construction site for 50 hours as part of a voluntary event. How many hours does he have left after he worked on the construction site for 9 days at 3 and 1 half hours?