Construction 64524
The bricklayer and the apprentice will build the wall in 6 hours. If the bricklayer worked alone, the wall construction would take him 5 hours shorter than the apprentice. How long before the wall would the bricklayer build himself?
Correct answer:

Tips for related online calculators
Are you looking for help with calculating roots of a quadratic equation?
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall?
- Together 4158
Daniela and Michal would dig potatoes together in 7.5 hours. But if Daniela worked alone, it would take her 2.5 hours more than Michal. Find how much Michal would do and how much Daniela would do the work himself.
- Bricklayer 65064
The bricklayer could repair the wall himself in 30 minutes. Students would learn in an hour. How long will it take them to work together?
- Turners
Two turners perform joint work in 3 hours. The first-turner would perform the job himself in 7 hours. How long would the same job last for a second-turner if he worked alone?
- Apprentice
The worker and apprentice execute the work for 6 hours. The worker performs himself in 10 hours. How long does the work of an apprentice take?
- Two masons
Two masons built the garage together—it took 18 days. If they worked independently, the other would have worked 15 days more than the first. How many days would it take each mason to build the garage alone?
- Novak
Novak needed to dig up three of the same pit in the garden. The first pit was dug father alone for 15 hours. His second dig son helped him, and it did that in six hours. The third pit was dug son himself. How long does it take him?