Forest clearing
A bark beetle attacked part of the forest. The first woodcutter would need ten shifts to clear the forest, the second 6 shifts, and the third five shifts. Calculate how many shifts the forest will take if they work together.
Final Answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Stream cleaning hours
Thirty pupils took part in the cleaning of the local stream. Everyone had to work t hours. N pupils worked half an hour longer. How many hours did the students work to clear the stream? - Workshop shifts
Workshop A can fulfill a specific order in 8 changes, workshop B in 10 modifications. How many shifts will the job be completed if workshop A works on only the first two shifts and both workshops work on the remaining shifts? - Logger field clearing
Fifteen loggers would take 12 days to clear a large field. How many days did this work require, if 5 more woodcutters were transferred to them after 4 days of work? - Tree planting workers
Fifty part-time workers planted 5,200 trees in a forest on a weekend brigade the forest in 9 hours. How many more part-timers do they have to lose next time to plant the same number of trees in eight hours? - Working time
If work is done in 16 days at a 10-hour shift, how many days will it be done at 8-hour shifts? - Two 2
Two different harvesters harvested potatoes with an area of 6.6 ha in one shift when they were operating simultaneously. The area of land from which the less powerful harvester was able to harvest potatoes in six shifts, the more powerful harvester in - Three Groups Work Shifts
A group of fitters installed the cable line in 9 changes, and the second group completed the same task in 1/3 less time. How many shifts would the third group do the same work if, with all three groups working together, the assembly took 2 shifts?