A worker loads sand into a car in 5 hours. How many minutes will this carload a loader 120 times faster than a worker?
Correct answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Two trains
Two trains are running the same distance. 1st train will travel in 7 hours 21 minutes. 2nd, the train will travel 5 hours, 57 minutes, and 34 seconds, and it is 14 km/h faster than the first train. What are the speeds of trains, and how long is this railw
- Apprentice 20753
The trained worker will do the work in 4 hours. The apprentice needs 6 hours for the same work. How many hours and minutes would they do this work if they worked together?
- Distance between two cities
The car went from A to B in 4 hours. The car was up 15 km/h faster on the way back. The return trip took 48 minutes shorter than the way there. Find the distance of cities A and B.
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks?
- Swimming pool 6
We open the first pipe and, after two hours, open the second pipe without closing the first. The swimming pool will be filled with both pipes in four hours. If we open the first pipe itself, it will fill the pool 1.5 times faster than the second pipe. How
- Motorcyclist 6145
The cyclist covered a certain distance in 6 hours and 15 minutes. How long will it take for a motorcyclist to travel five times more if he travels three times faster?
- Two workers 10
Worker P can do a work 3 times faster than Q and therefore takes 40 days less than Q.Find the time in which P and Q can complete the work individually.