Work word problems - page 7 of 41
Number of problems found: 811
- Production 80546
In a factory, 10 lines produce many screws in 8 days. How many days will production be extended if two of them fail?
- Lila knows
Lila knows that 3/16 means "3 divided by 16." She uses this to find the decimal equivalent for 3/16. Enter a digit into each box to continue her work.
- Coefficient 80515
A tractor pulls a tree trunk weighing 1.5 t for a distance of 2 km along a horizontal road at a constant speed. What mechanical work does it do if the coefficient of sliding friction is 0.6?
- Wayne
Wayne can clear a plot of land in 1/3 hours, and Melvin can clear the same plot of land in 2/4 hours. What could possibly be the time for both Wayne and Melvin if they combine to clear the same plot of land?
- Construction 80124
The father offered to work on the construction site for 50 hours as part of a voluntary event. How many hours does he have left after he worked on the construction site for 9 days at 3 and 1 half hours?
- Hypotenuse 79904
I have a right triangle, the length of the hypotenuse is c 20, and I only know the side ratio a:b = 2:1. I can't figure out the actual length of the hangers = I'm already an old man, and my brain doesn't work at 100% like it did years ago at school - I co
- The angles 3
The angles in a triangle are in the ratio of 3:4:5. Work out the size of each angle.
- Pasture 79214
I need to find out the number of bulls in the third period. In the first period, 12 bulls grazed on 3 and 1/3 ha for 4 weeks. In the second period, 21 bulls graze on 10 ha for 9 weeks. How many bulls in the third period graze for 24ha and 18 weeks? The pa
- A construction 2
A construction company will be penalized for its bridge construction delays. The penalty is set at 4,000 for the first day and shall be subjected to a 1,000 increase for each succeeding day. The company can afford a maximum payment of 165,000 for a penalt
- Two painters
Two painters are assigned to finish painting the houses in a housing project. John can finish a house in 4 days, and Kurt painted it in 3 days. How long would it have taken if John and Kurt had worked painting the house together?
- 7 men
Seven men can complete work in 52 days. How many days will 13 men finish the same work?
- Sipho
Sipho and John got the same amount of work; Sipho did 19/34 of his homework, and John did 23/41 of his homework. What percentage of his homework did John do, and what percentage of his homework did Sipho not do?
- RT a-b-x
There is a right triangle with legs long a, b, and hypotenuse long x. Given that a = 6 cm and b = 9 cm, work out x. Give your answer as an exact surd.
- Building a wall
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places.
- A plumber 2
A plumber charges $29.00 for an hour of work. How much would he charge for a job that took him 1 3/4 hours to finish?
- The interior
The interior angle of a regular polygon is x. If x is 9° less than the average of 153° and 145°, find the number of sides of the polygon.
- The fuel
The car's fuel was ¾ full at the beginning of the week. At the end of the week, there was ⅛ of a tank left. a. Did the car use more or less than ½ of a fuel tank? How do you know? b. How much more or less than ½ of a tank did it use? Show your work using
- A hairstylist
A hairstylist schedules 1/4 hour to trim a customer's hair and 1/6 hour to style the customer's hair. The hairstylist plans to work 2 1/3 hours daily for five days weekly. How many appointments can the hairstylist schedule weekly if each customer must be
- Work space
Every person in a conference room must have at least 36 square feet of workspace. A conference room is 28 by 20 ft. find the maximum number of people the room can accommodate.
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.