Work word problems - page 26 of 41
Number of problems found: 811
- Sufficiently 7059
The king gave the mason Václav the task of building a wall 25 cm thick, 50 m long, and 2 m high. If Václav had worked without a break and at the same pace, he would have built a wall in 26 hours. However, according to the valid royal regulations, Wencesla
- Performs 7048
The older type of point device performs 50 spot welds in 10 minutes, and the new type has five more welds. In how many hours will the work produce a total of 945 welds?
- Five pupils
Five pupils clean 30 chairs one hour before four pupils. How many chairs clean one pupil in 1 hour?
- Two diggers
Two diggers should dig a ditch. If each of them worked one-third of the time the other digger needed, they'd dig up a 13/18 ditch together. Find the ratio of the performance of these two diggers.
- Two masters
The two masters will make as many parts as five apprentices simultaneously. An eight-hour shift begins at 6 o'clock. When can a master finish the job to produce just as much as an apprentice for the whole shift?
- Summer tires
Three tire servants must change the summer tires on six cars in 2 hours. Mark's replacement would take 4.5 hours, Jirka would do it in 3 hours and 10 minutes, and Honza in 4 hours. Will they be able to replace all tires at the desired time?
- Bricklayer
How much do we pay for a bricklayer laying pavement in a square room with a diagonal of 8 m if 1 sqm of work will cost CZK 420?
- Workers 9
If two workers fix two windows in an hour, how many windows can 18 workers fix in the same two windows?
- Evening shift
While working the evening shift, Officer K took 8 hours to complete a task at his workstation, and Officer M took 10 hours to complete the same task at his workstation. How long would it take Officer K and M to complete the same task, each working at his
- Tractors
Five tractors will plow the field for 8 hours. In 2 hours, one tractor broke down. How long do the remaining tractors complete the plow?
- Bricklayers
Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days?
- Mumbai
A job placement agency in Mumbai had to send ten students to five companies, two to each. Two of the companies are in Mumbai, and others are outside. Two students prefer to work in Mumbai, while three prefer to work outside. How many ways can assignments
- Together 3
If Sally can paint a house in 4 hours, and John can paint the same house in 6 hours, how long will it take for both of them to paint the house together?
- Two pumps
Pump A takes twice as long to fill a tank as B. Together, they take 2 hours to fill the tank. How long does each one take to fill the tank by itself?
- Sewing
Beth's mother can sew 235 pairs of short pants in 6 days, while Lourdes can sew 187 pairs in 8 days. How many more pairs of short pants can Beth's mother sew?
- Electricity consumption
Calculate how much we will pay for 1 hour of consumed electrical energy if the seller sets a price of 0.126 euros for 1 kWh (all appliances together for 1 hour of work). Table: Appliance ; Power (W) Washing machine ; 2300 W Bulb ; 40W Refrigerator; 200W T
- Performance
Two masons with the same performance would have been made of plaster for six days. One of them, however, has increased its daily performance by 50%. How long would it take them now to make plaster together?
- Bulbs and electricity
In the sports hall, 875 identical light bulbs light for 2 hours. How long do 100 such light bulbs consume the same amount of electricity?
- 40% volume
40% volume with 104 uph (units per labor hour) 8 people are working. What is the volume?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.