Work word problems - page 23 of 41
Number of problems found: 811
- People 8055
In 12 days, ten people will dig a 3km cable car. In how many days will five people dig it up?
- Employees 8053
The company paid three employees 50 euros, 100 euros, and 60 euros. They are to receive a total of 735 euros for further work. How will they divide this amount if it is divided in the ratio as in the first case?
- Eight hours
Brigadier Franta ties a sheaf of hay in 20 minutes. Lujza, at the same time, only a quarter. How many sheaves will they tie together in 8 hours?
- Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if the company added five workers to it after four days?
- Ten cashiers
Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes?
- Exactly 8019
If there were 48 lines 10 cm long on each page, the book would have exactly 100 pages. How many 12cm long lines would be on each page for a book to have 80 pages?
- Inlet minus outlet
Water flows into the tank through two pipes and out of the third pipe spontaneously. Pipe A would fill the tank in 3 hours, pipe B would fill in 4 hours, and pipe C would flow out in 12 hours. If all three pipes open simultaneously, how long will the tank
- Flowerbed
Ondra digs the bed in 20 minutes, Cuba in 30 minutes. How long do they dig together?
- Tony works
Tony works as a welder for a construction company. His hourly wage is $15.51, and he works 40 hours per week. Tony gets paid vacation each year. The construction company is doing well and has plenty of work for the next year. Tony can expect to work the e
- Five mechanics
Five mechanics will make a car for some time. How many cars can 30 mechanics produce at the same time?
- Education 7919
A total of 10 teachers work at one small school in Moravia. Their monthly salary is CZK 21,500, CZK 21,800, or CZK 22,500, depending on their education and age. The average monthly salary of a teacher at this school is CZK 21,850. How many teachers of thi
- Company and employees
There are 370 employees in the company - women are 15% less than men. How many men work in the company?
- Pumps
After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would it take to drain out with three equally powerful pumps?
- Tributaries 7857
Two hundred forty liters of water flow into the tank from 6 tributaries in 6 minutes. The wider one will flow 20 liters more in 9 minutes than the narrower one in 11 minutes. How many liters of water flow out of each inflow in 1 minute?
- Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Hectoliters of water
The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water simultaneously?
- Together 7810
One painter would paint a school by himself in 28 days. The second painter would paint the school by himself in 24 days. They also called a third painter because they needed to paint the school in 8 days. The three of them painted the school together in 8
- Three workers
The three workers received € 2,850 together for the work done. They divided it according to the time worked, so the first received 20% less than the second and the third € 50 more than the second. Thus, each worker received € 2,850.
- Workers 7767
Twelve workers would earn € 800 in 10 days. How many euros would 14 workers earn in 8 days?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.