- Building 20293
Two workers will build the building in 10 hours. How many hours would they have built the building if three more workers had helped them?
- Performance 20233
How much percent performance improvement is needed if the work we have planned for five days has to be managed in three days?
- Adjustment 20163
Two students adjust the flower bed in 3 hours. How long will this adjustment take for the pupils if they invite four helpers?
- Horses 20063
Nine horses need a lot of hay for two days. How many horses would the same amount of hay be enough for three days?
- Supermarket 20053
When only three checkouts are open in a supermarket, people wait in line for an average of 10 minutes. How many minutes will the average waiting time in line be if two more checkouts open?
- Complete 19783
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover?
- Tractors 19713
Two tractors are working on plowing the field. If only the first tractor plowed, it would plow the field in 3 hours. The second tractor would plow the field by itself in 6 hours. How long will it take to plow if they work together, but the other starts wo
- Inspectors 19633
Five inspectors will catch an average of 70 black passengers in 6 days. How many black passengers are caught by nine inspectors in 10 days?
- Neighboring 19293
Farmers had three harvesters at their disposal during the harvest, with which they would harvest the fields in 9 hours. How long will it take them if two more harvesters from the neighboring district come to help them?
- A lot of hay
Martin's grandfather weighed a lot of hay and calculated that it would last 100 days for 15 rabbits. How many days will this lot be enough for 25 rabbits?
- Bricklayers 18773
According to the standard, we calculated that two masons would plaster the corridor of the new school building in 54 hours. How long would it take for nine bricklayers to plaster this corridor?
- Harvesters 18633
Rope wheat harvests seven combine harvesters in 5 days at total capacity. The weather forecast is required to complete the harvest in 4 days. How many combined harvesters had to be used together?
- Fifteen 18403
Fifteen ants bring 10 g of food to the anthill in 1 hour. In how many hours will five ants carry 1 kg of food?
- Produced 18213
In the factory, they produced 1,500 products a week on five machines. How many machines do they need to produce 2,000 products a week?
- Double-performance 17931
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m
- Together 17881
Six maids make 200 beds in 2 hours. One maid makes 50 beds alone. Then, they all continue together. How long will it take them to make the rest of the beds together?
- Simultaneously 17821
The reservoir is filled with the first pump in 30 hours, the second in 24 hours, and the third in 20 hours. How long does it take to fill the reservoir if all pumps are switched on simultaneously?
- People 17333
The room is 240 cm high and has a volume of 48 m³. How many people can work in it when there is 7 m² of floor space per person?
- Flowerbed 17183
Six pupils will adjust the flower beds on the school grounds in 2 hours. In how many hours will four pupils change the same flowerbed?