Arithmetic - math word problems - page 220 of 221
Number of problems found: 4415
- Solutions 8481
For which integers x is the ratio (x + 11) / (x + 7) an integer? Find all solutions.
- Five numbers in ratio
Five integers are in the ratio 1:2:3:4:5. Their arithmetic mean is 12. Determine the smallest of these numbers.
- AM of three numbers
The number 2010 can be written as the sum of 3 consecutive natural numbers. Determine the arithmetic mean of these numbers.
- Z7-I-4 stars 4949
Write instead of stars digits, so the next write of the product of the two numbers is valid: ∗ ∗ ∗ · ∗ ∗ ∗ ∗ ∗ ∗ ∗ 4 9 4 9 ∗ ∗ ∗ ∗ ∗ ∗ 4 ∗ ∗
- Consecutive 29761
Determine three consecutive natural numbers, the sum of which is 66.
- Crimson Lynx
Captain Emily has a ship, the H. M. S Crimson Lynx. The ship is five furlongs from the dread pirate Umaima and her merciless band of thieves. If her ship hasn't already been hit, Captain Emily has a probability of 3/5 of hitting the pirate ship. If her sh
- Smallest 79434
Find the smallest natural x such that 2x is the square and 3x is the third power of a natural number.
- Census pyramid
Vojta added five different prime numbers to the top row of the census pyramid. Their sum was 50. What was the biggest number he could get "down"?
- Positive integer integral
How many different sets of a positive integer in the form (x, y, z) satisfy the equation xyz=1400?
- Grass garden
Mr. Grass would mow the garden for 5 hours, and his son Michael could do it for 7 hours. They agreed to wake up at 5 AM and begin to mow together. Ms. Grass needs to drive into town at 8:30. Michael says that at that time, they're done with work. Is he ri
- Quadrant four
Which point is located in Quadrant IV? A coordinate plane. A(-8, 6) B(-8, -6) C(8, -6) D(8, 6)
- Summer tires
Three tire servants must change the summer tires on six cars in 2 hours. Mark's replacement would take 4.5 hours, Jirka would do it in 3 hours and 10 minutes, and Honza in 4 hours. Will they be able to replace all tires at the desired time?
- Production 24021
The plant has to complete the order in 40 working days. Production takes place in two workshops. In the first one, there are more workers; therefore, they would complete the order themselves in 70 working days. In the second workshop, they would complete
- Simultaneously 82806
An empty tank is filled with inflow in 30 minutes. A full tank is emptied in 75 minutes with an open drain. How long does it take for an empty tank to fill up if both the inlet and outlet are open simultaneously?
- Christmas trees
The salesman sold Christmas trees: spruce for € 22, pine for € 25, and fir for € 33. In the morning, he had the same number of spruce, fir, and pine. In the evening, he had all the trees sold for € 3,600. How many trees does the day salesman sell?
- Two-digit 64294
How many natural two-digit numbers can we form from the digits 0, 1, 2, and 3 if the numerals cannot be repeated in these numbers?
- Pedestrians 32231
One pedestrian walked the 16km track in 3.12 hours Two pedestrians walked the 18km track in 3.18 hours Which one had a higher average speed on its track?
- Business 24751
Dad drove a business trip to a place 348 km away. He arrived at the scene after four hours. What was the average speed?
- Painters
The first painter painted the fence himself for 9 hours, the second painter 2.1 hours sooner than the first, and the third painter slowest up to 21 hours. How long took them to paint the fence if they worked together?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.