Employees 46923
The new water supply pipeline is to be 1.2 km long. Employees put it from both ends. On one side, 0.492 km of pipeline is laid, and on the other side, 53,500 cm of a pipeline. How many meters of pipe are left to lay?
Correct answer:

Tips for related online calculators
Do you want to convert length units?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Two pipes
How long will the pool be filled with a double supply pipe if it takes the pool to fill the first pipe by 4 hours long and the second pipe 9 hours longer than both pipes open simultaneously?
- Cylinder 19723
Pool in the shape of a cylinder with a diameter of 10 meters and a height of 1m 80cm. How long will it be filled with a pipeline with a flow rate of 5,000 liters per hour?
- Smaller 4657
Two supply pipes open into the pool, and the smaller pipe fills the pool in 40 hours. The empty pool will be filled in 16 hours if we open both supply pipes. How long would it take to fill if only the second, larger inlet pipe was opened?
- Constructing 67634
During the construction of a 140-meter-long gas pipeline, a pit with vertical walls 1.5 m deep and 1 m wide must be created. A) How many cubic meters of soil must be dug up? B) We spread the excavated soil evenly on a field with dimensions of 70 m and 120
- Martina
Martina is solving the equation 4x - 11 = 2x + 391. Here are the first steps of her solution. 4x - 11 = 2x + 391 2x - 11 = 391 2x = 402 What did Martina do to get 2x - 11 = 391?
- Maximally 4036
Mr. Novák wants to pave the terrace with tiles of two sizes to be as small as possible. Its terrace is square with a side 3 meters long. There is a wall of the house on two sides of the terrace. Next to the wall, he wants to put small tiles, the rest larg
- Employees 83264
The company laid off employees during the crisis, so at the end of the crisis, it had 40% fewer employees than before the crisis. When the company hired 42 new employees after the crisis subsided, it had 25% more than at the end of the crisis. How many em