Temporary 1637
Three temporary workers will clean 60 meters of the sidewalk in 5 hours. How many meters of sidewalk will clean by seven temporary workers in 8 hours?
Correct answer:

Tips for related online calculators
Check out our ratio calculator.
You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Tmp workers
Three temporary workers cleaned 60 m of the walkway in 5 hours. How many meters of the walkway were cleared by seven volunteers for eight hours?
- Part-timers 6344
Certain work was to be done by 21 workers during an eight-hour workday, due in 12 days. After five days, temporary workers came to their aid. They all worked together for 7 hours a day and finished the job in 6 days. How many part-timers were there?
- Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters.
- In the Gargen
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile
- Summerjob
Temporary workers Franta ties a sheaf of hay in 20 minutes, Lojza only a quarter in the same time. How many sheaves do they tie together in 8 hours?
- 3 pupils
Three pupils cleaned 10 meters of the stream in 1 hour. How many meters of the stream will clean 18 students in 4 hours?
- Harvested 6269
Five workers harvested fruit in 150 hours. How many temporary workers have to work to harvest fruit in 250 hours?