Equation + work - practice problems - page 3 of 22
Number of problems found: 427
- Seamstresses 82403
Eight seamstresses sew an order in 85 hours. After 21 hours, 3 seamstresses had to leave for other work. In how many more hours will the order be fulfilled? How many hours did the whole job take?
- One-twentieth 82239
Peter and Honzo decided to build the building as quickly as possible. They built one-twentieth of the building in ten minutes. After 20 minutes, three more friends joined. Everyone was building at the same pace. How many minutes did it take to build the s
- Competition 81952
All three team members took turns fulfilling the competition task without delay. The first member used up 30% of the total competition time. The second needed 10 minutes more than the first, and only 10 minutes remained for the third. What % of the total
- Friends 81769
Four guys would finish washing cars at a gas station in 4 hours. After one hour, two more friends come to help them. How long will it take to finish the car wash?
- Recommended: 81764
If the interval between bus arrivals is shortened by one minute, there will be 5 more buses on this route per hour. How many buses ran on the original route? (Recommended: solve with an experiment or a table where we look for the dependence between the le
- Harvested 81719
Eight hop pickers harvest in 24 days. How many more pickers must be hired if the hops need to be harvested in 16 days?
- Apartment 81654
A woman cleans an apartment in 8 hours and a man in 10 hours. How many hours will they clean together?
- Simultaneously 81441
The tank is filled through three openings, A, B, and C. The simultaneously open inlets A and B are filled in 1 hour, inlets A and C in 45 minutes, and inlets B and C in 1.5 hours. How long would it take to fill each inlet separately?
- Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work.
- Painters 81101
Four painters painted the house in 14 days. How long will it take if 2 more come to help after 5 days?
- Cleaners 81056
Four cleaners will clean the hotel in 15 hours. How long will they clean if, after 8 hours, one gets injured and leaves?
- Together 81046
Two painters are painting the factory fence together. If everyone worked alone, the first would finish the job in 16 days, the second in 20 days. When will they finish the work together?
- Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe
- Participated 80621
Three 9th-grade classes participated in the paper collection competition. The company bought 1 kilogram of paper for €0.12, and the school received €174 thanks to their hard work. Calculate how many kg of paper 9A collected if you know that she collected
- Wayne
Wayne can clear a plot of land in 1/3 hours, and Melvin can clear the same plot of land in 2/4 hours. What could possibly be the time for both Wayne and Melvin if they combine to clear the same plot of land?
- Pasture 79214
I need to find out the number of bulls in the third period. In the first period, 12 bulls grazed on 3 and 1/3 ha for 4 weeks. In the second period, 21 bulls graze on 10 ha for 9 weeks. How many bulls in the third period graze for 24ha and 18 weeks? The pa
- A construction 2
A construction company will be penalized for its bridge construction delays. The penalty is set at 4,000 for the first day and shall be subjected to a 1,000 increase for each succeeding day. The company can afford a maximum payment of 165,000 for a penalt
- 7 men
Seven men can complete work in 52 days. How many days will 13 men finish the same work?
- Calculate 72594
Karel, Peter, and Milan helped pick apples. It took Karl 30 minutes, Peter 45 minutes, and Milan 36 minutes to turn over one full box of apples. Calculate how long it would take them to acquire 3 full crates together. Mark one answer: a. 32 minutes b. 36
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.